If you make a plan, plan on having to change it!
Forgotten but not lost..that's the theme of my blogging thus far. So here we are, June 28, 2013. Let's bring things up to date:
1) Luna Sole- STILL not done...sigh...planning to launch in 1 month (but we have seen how that has gone so far). I'm projecting maybe Mid August. More on this below.
2) July 2012: We lost our little girl Miss Buffett to cancer. Such a sad time. My heart broke. She never got to sail on the boat she so patiently sat under for 3 summers while we worked away at the dream. However, thanks to our wonderful marina friends who loved her too, she did get to sail on their boat. She would have been a great boat dog. RIP Buffett Girl.
3) October 2012: We pulled Eclipse out of her slip, removed the mast and sent her down the road to Rewers Boat Works to have her bottom re-done. She will stay put for many months while she is peeled, dried, re-fiberglassed & barrier coated. While we were removing the Bow Pulpit so she would fit into the shop, Tom noticed that the Bow Sprit seems to be.......I don't even want to say it.....ok...here goes....Rotten! What? Again? Unbelievable that we could possess 2 boats and both have rotten Sprits. Sigh...here we go again.
4) We adopted a new golden boat dog named "Spirit". He is about 2 so, god willing, he will be with us for a long time and be a happy boat dog. I love my little boy, but miss my Buffett Girl every day. :-(
5) Winter came, and it was FREEZING up here in the great Northeast!!! We spent about 6 weekends going back and forth to Rock Hall working on Eclipse (removing said bow pulpit and sprit, removing prop shaft, etc.) in preparation for her bottom job before it just got too cold to work. After that we worked primarily at home on new cushions for Luna Sole. This is a tougher project than I imagined and I've done a lot of ripping out/starting over. I think they will be lovely though when finished!
6) SPRING! Ahhhhhhhh (Imagine Angels with trumpets playing overhead...) Back to work on Luna Sole. We had originally said "We're done- finished. May 1st- whatever is done is done and we are putting her up for sale". Then, as plans go, it was freezing all winter and we got at least 2 months behind. So, May 1st is now sometime this summer. Once we started working, and it was apparent that Eclipse was going to be out of commission for the summer with her bottom job & new rigging needs, we took a hard look at what $30K would buy as far as new equipment for Eclipse- Water Maker, Wind Generator, Solar Panels, Batteries - and decided to keep on keeping on. What's a few more months right? :-)
So, here's the list of what is done thus far. When you see the bottom paint go on, you'll know we are launching and pretty close to finished- keep your fingers crossed and say a little prayer. :-)
Completed |
Replace
Bow Sprit & Bow Deck- Rotted |
Repair Deck to Hull Joint
issue in Bow |
Re-varnish all existing teak-
exterior |
Re-bedded handrails & made
covers |
Re-caulked mast & new boot |
Re-bedded all chainplates |
Replaced missing tightener
screws on all stantions |
Reinforced foresail with new
fiberglass G-10 backing plate |
Rebuilt furler system |
Rebuilt cockpit winches |
Replaced eyebrow's with new
teak strips |
Replaced existing plastic deck
& scupper drains with Bronze fittings |
Replaced traveller deck with
new teak piece- rotted & split |
Anodized traveller &
cleats |
Replaced rubber durad vents
with Stainless vents |
Removed & repaired cockpit
floor with new Fiberglass platform |
Repainted cockpit floor |
Re-positioned steering
mechanism to work more effectively |
Replaced cracked holding tank
with new tank |
Repaired and cleaned water
tank |
Painted Lazarette & locker
areas |
Repaired all fiberglass cracks
in the bilge area |
Replaced Engine with new Beta
Marine 25 HP Model |
Fabricated all new engine
mounts |
Removed & repaired head
floor & repainted head area |
Replaced Head floor drain |
Designed and installed new
toilet mount |
Repaired & improved
Propane Locker |
Ran new hose & replaced
valve on Propane tank |
Changed out all gate valve
thru hulls with Bronze Groco valves |
Changed out all wooden thru
hull backing plates to Fiberglass G-10 plates |
Added proper lightening
protection system (plate and wiring) |
Replaced aluminum Helm mount
with Stainless mount |
Replaced aluminum chalks with
new Stainless chalks |
Replaced exhaust thru-hull
with new one and added fiberglass backing plate |
|